The boss is not as good as the driver, he didn't want to think, but now it has become a reality, the reality of my good friend tiger boss a little bit cruel. It's a sad thing to start with the tiger's boss and don't want to say more. Later, in my inquiry, the tiger boss told the original Committee.
Find it difficult to find a job
Looking for a job is a great demand and one of the most expensive and financial resources for the tiger boss. More than 90% of the work he takes is based on the subcontracting of interpersonal relations. In the middle, he often entertains guests to dinner, and he should give a rebate to a contractor at the next level. As the owner of the individual, the owner of the tiger could hardly reach the one hand project.
The driver has a risk
According to Hu boss introduced his area to find the driver is not difficult, 10:3 is probably the proportion of and machine hand, obviously pile up in excess of requirement. There are only three ways to find the hands of the tiger boss: a friend introduction, a previous understanding of his own, and a WeChat group in Tangshan.
But the level of WeChat team is uneven. If you can't find the familiar machine hand, you can only find the machine hand that you have never used before. There's a certain difference between them. The tiger boss gave an example: good day hand machine loading 120 cars, a lower level machine hand one day can only hold 80 cars, not to hand machine 70%, and fuel consumption to a lot better than machine hands high, one day to earn 30%~40%.
The most difficult to account
Account can be said to be the biggest pain point tiger boss. On account of bad debts, the RBI relations of the high costs, most projects have to wait until the end of the settlement, and are not one hundred percent settlement, repeated account will be consumed.
Tiger boss once made a project, to the end of the year is still owed 180 thousand, push N times, eventually get a 'underground parking spaces (claiming value 100 thousand), and 30 thousand cash. The parking space was finally discounted at a price of 70 thousand, so he got only 100 thousand and lost 80 thousand.
According to the statistics in the process of tiger boss, his own business, as high as 30-40% encountered arrears project, many local Laolai, and these old Lai is not money, but gambling all day playing cards, is not to rely on forward.
The effect of a shutdown order
This nationwide shutdown order has brought no small impact on the users of the construction machinery, especially in the Beijing Tianjin Hebei region. The tiger boss is using Komatsu PC200-8 with Kang Chashi system, display system of this machine has more than two months without the construction. In 2017, the owner of the tiger's Excavator worked only 500 hours, which was far below the profit and loss point.
On the policy front, seemingly no way of digging machine boss, can only do, how to spend the downtime is critical to undertake projects and capital turnover next.
A problem
One of the problems is also troubled by a tiger boss, his Komatsu excavator has been ten years old, work more than 10000 hours, a small problem is often things, which requires a digging machine onto the repair shop for maintenance. The question is, can enter the garage only the repair shop that I find a car, I can only use the car. A cost obviously high than the market.
Pain, but still persisting
Influenced by many factors, tiger boss's management in recent years is not optimistic, but with this love, he is still working hard in the construction machinery industry.
Tiger boss is not hard. In the past two years, he has begun to devote himself to the agricultural machinery industry. The family has 4 agricultural machines, and is currently considering a partnership with his relatives to receive a second-hand German original silage machine.
According to his introduction, the income of his family in the agricultural machinery industry in 2017 has exceeded the engineering machinery industry. And many of the engineering machinery friends around him have planned or have started to move to farm machinery.