Home>News
Three-phase AC in working hydraulics, recoverable 80 percent braking energy, and maintenance-free brake pads target multi-shift warehouse total cost of ownership
Skid-steer footprint, rotating upper structure, and 700-series working envelope deliver excavation, loading, and dumping without machine repositioning
Refined hill-hold speed management, improved suspension cab, and Stage V engine option consolidate Bell’s leadership in hard-rock hauling beyond Southern Africa
Closed-center load-sensing hydraulics, multiple power modes, and standard telematics position the machine for municipal, landscape, and utility excavation work
180-degree rotating turret head, Open View mast, and 584-inch elevation bring man-up order picking to very-narrow-aisle racking up to 50 feet tall
Seven-section 70-meter boom, five selectable outrigger spans, and fully electronic Crane Control System bring long-boom 300-ton capacity to congested jobsites
Alternating drum excitation prevents aggregate crushing while maintaining high compaction density on sensitive bridge decks
Real-time forklift tracking and digital “Geo-Zone” speed limiting improve pedestrian safety and warehouse throughput by 20%
Predictive load logic and engine map optimization deliver 8% higher fuel efficiency without compromising digging force
Non-contact ultrasonic measuring system and digital terrain model integration ensure precise material removal on bridge decks
Dual-path hydraulic flow control provides variable steering ratio, reducing operator effort in tight aisles while ensuring stability at speed
Electronic pilot signal processing and adjustable joystick sensitivity curves reduce operator fatigue in high-cycle loading operations